go back to portfolio
Wood Floor Installation
.jpg)
This project was completed right after the new homeowners purchased the house. We replaced the old carpet with 900 sq ft of new engineered hardwood flooring across 5 rooms. The work included removing the carpet, grinding and applying self-leveling compound on the first floor, removing and adjusting joists on the second floor to achieve a perfectly even surface on both levels. After leveling, we installed the engineered hardwood, added 300 linear feet of new baseboards, and finished with transition lanes and end caps for a clean, professional look.